I Wrote a Training Programme. Then I Checked It.

A finish date on the wrong day, four lessons delivered by nobody, and a demo of a button that no longer exists — what checking my own training plan found.

The programme was finished. Seventeen sessions, two hours a day, five phases, a spine requirement chosen and parked.

Then I built the coverage table. My own framework says a run without one is not ready, and I had written that rule before anything had ever forced me to use it.

Three things fell out of the check. None of them was visible while I was writing.

A Finish Date That Moved One Slot

The run was Monday to Thursday, 11 August to 10 September, two hours a day. One Wednesday in the first week was cancelled. Everything after it moved one slot later, which is the normal, boring consequence of a cancellation.

So the finish moved from Thursday 10 September to Monday 14 September.

14 September was the first day of my leave.

Nothing in the session briefs knew that. The briefs were written as content — objectives, platform mechanism, workshop, artifact. The date lived in the calendar. No one part of the plan compared the two, because comparison was not anybody's job until the table made it one. The tail had no slack either: a bank holiday on 31 August was already sitting in the middle of the run, so there was nothing to absorb the shift.

The fix was not an extra day. Session one had run long and covered, unplanned, the five requirement categories — the core of a later session — and the difference between metadata and data, which belonged to another. Two early sessions were therefore carrying real slack I had never noticed, because nobody writes down what a session accidentally delivered. Merging them returned the finish to Thursday 10 September and left the phase boundaries intact.

My alternative was adding a Friday. That would have broken a Monday-to-Thursday rhythm somebody had already learned, for the sake of a date nobody outside the room was holding me to.

What caught this was arithmetic, and it took four minutes: session count against working days, against holidays, against my own availability. I had never once run it against the third item.

Four Lessons That Nobody Missed

The coverage table has one row per lesson and one column naming the session that delivers it. Forty-eight lessons across four modules.

On 26 August I reordered the run. The remaining platform breadth moved into a self-study window, and the supervised hours went to requirement analysis, which is the hardest module and the one that cannot be learned alone. Eight lessons moved out of live delivery on purpose, and that was the right call.

Four lessons stayed live on purpose too. Flow testing and order of execution. I kept them in the room precisely because I had judged they needed a trainer present.

Then the two sessions holding them went elsewhere. One became a checkpoint that had been requested and deferred twice. The other became an early pass at static analysis and the six-question gate. Both were good uses of two hours. Neither was the plan, and I made both decisions in the room, on the day, with the run document closed.

Rebuilding the table afterwards put those four lessons in no column at all. Eight of the twenty lessons in that module had been delivered. The honest claim for the run became 36 of 48 taught, 8 assigned, 4 dropped.

The thing that unsettles me is how quiet it was. There was no moment where something got cancelled. Nobody felt a gap, because the agenda everybody was holding still listed the material as coming, and "it will be covered" had been said out loud more than once, perfectly sincerely, with no date attached. Nothing in the room was capable of contradicting it. The table contradicted it in one pass.

Repairing it was cheap, and it was not a session. Those four lessons went into the self-study window alongside a project that builds a flow anyway, and the agenda was reissued with three columns: what is taught in session, what is assigned, and when.

A Demonstration Built on a Button That Is Gone

My own session rule says the input block contains a demonstration or it is not a session. Slides about sharing rules do not survive contact with a sprint; two browser profiles on the same record do.

So the automation session had a demo written into it. Build a workflow rule and a record-triggered flow on the same object, save a record, watch which one fires first, then talk about what that means for a test. It is a good demo. It is not a demo I can give.

Workflow Rules and Process Builder are retired. In a current org there is no create path for either of them. The behaviour I had planned to build live exists only inside configuration somebody else built years ago.

Reading the brief did not catch this, because the brief reads perfectly well. What caught it was writing the demonstration out as the actual clicks, in the actual org, in order. A demo that cannot be reduced to a list of clicks is a demo I have not tried, and there is no difference between "I have not tried it" and "it does not work" until the session starts.

The session note now says what is true: that history is needed only for reading legacy configuration. The demonstration became reading an existing rule in the project org and predicting the order of execution before hitting save. That is closer to the actual job than building one ever was, which is the annoying part — the constraint improved the session.

Three findings. A date, a table row, a button. About an hour of checking, none of it clever: a calendar compared against a leave date, a table with one row per lesson, and a demo written out as clicks. I wrote the rule that a run without a coverage table is not ready, and then needed my own run to show me what it was for.

If you rebuilt the coverage table for the programme you are running right now, which row would have no session in it?